C.A.P.S. Inc.

Project Bridgeton, Missouri Role: General Contractor Project Highlights: – 28,000 SF Warehouse Addition – Tilt-up Construction – Site carved out of a hill – mass excavation. – Retaining wall 800 LF 15′ peak elevation and retention basin. -Rebuild of site infrastructure including the gas service, electric service, storm and sanitary sewer, water. – Half docks […]
Nu Calgon

Project Role: General Contractor Project Highlights: – New Corporate Headquarters and Warehouse – 90,000 SF Warehouse – 25,00 SF Attached Two-story Office Building Multi-Family Projects SHARE THIS POST Facebook Twitter Linkedin Pinterest
Chemtron Supply Corporation – St. Charles, Missouri

Project Chemtron Supply Corporation St. Charles, Missouri Role: General Contractor Project Highlights: – Chemical Manufacturing and Processing Facility – 12,000 SF Warehouse Addition – Tilt-up Construction – Not ideal construction location, it was built on the side of hill backing up to a creek which required 14′ high retaining walls to be installed. – Loading […]
Faultless Healthcare Linen

Project Faultless Healthcare Linen St. Louis, Missouri Role: General Contractor MBE / WBE Participation – Met St. Louis City Requirements Project Highlights: – 80,000 SF, Single Story with Mezzanine – Tilt-up Construction -Automated Commerical / Healthcare Laundry Facility -Two 4-Bay Laoding Docks -Administrative Offices, Plant Employee Break Room Manufacturing & Industrial Projects SHARE THIS POST […]