
Project Chemtron Supply Corporation
St. Charles, Missouri
Role: General Contractor
Project Highlights:
– Chemical Manufacturing and Processing Facility
– 12,000 SF Warehouse Addition
– Tilt-up Construction
– Not ideal construction location, it was built on the side of hill backing up to a creek which required 14′ high retaining walls to be installed.
– Loading dock drive addition and loading dock renovation
– Parking lot renovation
– H3 and H4 zoned hazardous construction areas