Project Chemtron Supply Corporation
St. Charles, Missouri

Role: General Contractor

Project Highlights:

– Chemical Manufacturing and Processing Facility 

– 12,000 SF Warehouse Addition

– Tilt-up Construction 

– Not ideal construction location, it was built on the side of hill backing up to a creek which required 14′ high retaining walls to be installed.

– Loading dock drive addition and loading dock renovation 

– Parking lot renovation 

– H3 and H4 zoned hazardous construction areas

Corporate Manufacturing
& Industrial

SHARE THIS POST