Project C.A.P.S. Inc.
Bridgeton, Missouri
Role: General Contractor
Project Highlights:
– 28,000 SF Warehouse Addition
– Tilt-up Construction
– Site carved out of a hill – mass excavation.
– Retaining wall 800 LF 15′ peak elevation and retention basin.
-Rebuild of site infrastructure including the gas service, electric service, storm and sanitary sewer, water.
– Half docks down at a time so that the exsting manufacturing plant was fully operational
– 7 new loading docks. dock drive and parking lot.